![]() Mechanical installation of two belt dryers in Sweden und Germany Mechanical installation and delivery of various components of a total of three belt dryer systems at Heggenstaller in Lauterbach and at Stora Enso in Norrsundet. In each case the task was to install the largest belt dryers which, with an effective operating width of 8 m, are almost twice as wide as conventional dryers and can thus significantly increase the productivity of the operator. ![]()
The mechanical and electrical installation of a double filter system The project at the company included the mechanical and electrical installation of two new filter plants for the rotary furnace dedusting. Since the existing plants for the flue gas cleaning didn‘t correspond any longer to the current pure gas content specifications (emission specification), the company had to invest in new filter plants. A bag filter was installed for the new filter system which was able to clean 700.000 m³ of crude gas per second. The crude and clean gas were all integrated into the new system. The final step was enclosing the two side by side filter systems. (Penthouse). ![]()
|
|
||||
| © 2008 SGS INDUSTRIAL SERVICES GmbH Gewerbepark 1 | 4751 Dorf an der Pram | Austria | T + 43 (0) 7764 20 048-0 | F + 43 (0) 7764 20 048-14 | office@sgs-industrial.com | IMPRINT | DISCLAIMER | TERMS | ||
|
|||

Stone-Earth-Cement
Metal-Aluminium
Wood
Wood based panels
Power Plants