![]() Installation of a Siempelkamp chipboard plant in Ugie (South Africa) SGS was contracted with the partial mechanical and electrical installation of a Siempelkamp chipboard production line at the new location. Included in the installation were the gluing station (incl. steel construction), the forming line (incl. steel construction), the pressing line, the finishing, the pneumatic transport system (from Scheuch) as well as the short tact-plant, the Anton saws and the complete thermal oil piping. ![]()
Mechanical and electrical installation of a Siempelkamp MDF plant and forming and pressing line, cooling and unloading station, sanding and packaging line, gluing and suction units Brazil
Uberaba: Our first large project in Brazil was completed in June 2008. The project involved the mechanical and electrical installation of a Siempelkamp chipboard froming and pressing line, cooling and unloading station, the sanding line and the packing unit. At peak times there were 70 mechanics on location in Uberaba, Minas Gerais. ![]()
|
|
||||
| © 2008 SGS INDUSTRIAL SERVICES GmbH Gewerbepark 1 | 4751 Dorf an der Pram | Austria | T + 43 (0) 7764 20 048-0 | F + 43 (0) 7764 20 048-14 | office@sgs-industrial.com | IMPRINT | DISCLAIMER | TERMS | ||
|
|||

Stone-Earth-Cement
Metal-Aluminium
Wood
Wood based panels
Power Plants