  The #SGSteam as part of the success in building a gas and steam turbine power plant in Wolfsburg

Industry
Energy
Status
completed
Country
Wolfsburg, Germany DE
Services
Construction management & supervision, Electrical installation, Mechanical assembly, Project Management
The #SGSteam once again contributed to the energy transition with its assembly work. On the Volkswagen AG factory premises, two hard coal blocks from the West thermal power plant were replaced by a double block fired with natural gas. In this context, SGS Industrial Services carried out the mechanical assembly of two gas turbine lines as well as the entire electrical installation.
110
Employees
 
22
Months of construction time
 
320
Control cabinets
 
650
km of cable
 
20.000
Connections
 
24
km cable support systems
 
50
tons of U, I, C profiles
 

Project data

Commissioner
Mitsubishi Power Europe GmbH
Customer
Volkswagen AG
Industry
Energy
Construction location
Wolfsburg, Germany
Contruction period
22 Months
Contributors
110
Specialties
Extensive work on a cramped construction site.

Scope of delivery & service

The mechanical assembly of two complete gas turbine lines was carried out on time by the #SGSteam with a turnaround time of 15 months.

Our team installed the following in detail:

  • 2 gas turbines including fuel gas system, each weighing approx. 220 t
  • 2 generators
  • 2GT Inlet Air System
  • 2 fuel gas units
  • 2 starting units
  • 2x Gas Turbine Cooling Air System
  • 2x Gas Turbine Lube Oil System
  • 100 tons of steel construction
  • 1200 piping spools (DN 15 – DN 400)
  • 700 flange connections
  • 550 welded connections
  • 5 tons of piping supports
  • Approximately 150 tons of sound enclosures

In the total construction period of around 22 months, in addition to the mechanical assembly of the gas turbine line, the #SGSteam::

  • installed 320 control cabinets
  • performed 20,000 connections
  • pulled 650 km of cable
  • installed 24 kilometers of cable support systems and
  • assembled 50 tons of U, I, C profiles 

Confined space, many construction measures taking place at the same time from different trades and the limited storage options on site were a challenge. Which we as a team were able to master as usual in the highest SGS quality through professional time and logistics management. 

About the project

Volkswagen AG is replacing the existing Wolfsburg-West hard coal-fired thermal power plant on the factory premises with a highly efficient gas and steam power plant from Mitsubishi. The new, highly efficient gas turbines aim to significantly reduce CO2 emissions in electricity and heat generation. 

  We are delighted to have gained a new customer from the energy sector, Mitsubishi Power Europe GmbH. As confirmation of the very good cooperation, we have already received follow-up orders. We are also pleased that we as the #SGSteam were able to make a massive contribution to reducing CO2 emissions.
Andreas Hofinger | SGS Industrial Services
Andreas Hofinger, Managing Director Operations
SGS Industrial Services GmbH

About our customer Mitsubishi Hitachi Power Systems Europe GmbH

Mitsubishi Power Europe GmbH, headquartered in Duisburg, is a subsidiary of the global Mitsubishi Group. It designs and builds power plants and offers long-term service and maintenance contracts. The plant manufacturer also supplies key components such as gas turbines, steam generators and environmental technology. The company relies on modern, environmentally friendly and efficient systems.

Safe. Global. Fast.

Worldwide projects on time & professionally.

YouTube is deactivated

We need your consent to use YouTube videos. For more information, see our Privacy Policy.

Vimeo is deactivated

We need your consent to use Vimeo videos. For more information, see our Privacy Policy.

Google Maps is deactivated

We need your consent to use Google Maps. For more information, see our Privacy Policy.