SGS Industrial Services is carrying out the mechanical assembly of a gas and steam power plant in Flémalle, near Liège, Belgium. In addition to the mechanical assembly, the order also includes the electrical installation of the PowerControlCenter and LV Transformer of the gas and steam turbine as well as the piping of the system including prefabrication and insulation. Our customer Engie relies on the know-how of our #SGS team, which we were able to acquire, deepen and expand in previous projects with and for Siemens Energy.
100
Employees
 
13
Months of construction time
 
4.500
Tonnes of mechanical equipment
 
60
KM cable
 
2.500
Cable connections
 

One of the largest energy infrastructure projects in Belgium is being implemented in Awirs, Flémalle. Engie/Electrabel is building an 875 MW power plant.

With an output of 875 MW, it will be able to supply more than 1,000,000 households with electricity. This new gas and steam power plant will represent an essential link in ensuring the country's security of supply in the future.

Essential for this project are the Siemens SGT5-9000HL gas turbine, the SST5-5000 steam turbine and a heat recovery steam generator (HRSG).

And this is exactly where the #SGSteam's know-how comes into play.

Previous projects that were successfully completed together led to Siemens Energy recommending that Engie implement this project with SGS Industrial Services. We are pleased to have convinced you with our performance and to now be able to implement another project in the area of ​​gas and steam power plants.

  We are proud that our service is recommended and that we can participate in new, important projects in the areas of energy transition and energy stability. We are very pleased about the trust you have placed in us.
Andreas Hofinger
Managing Director SGS Industrial Services

Project data

Commissioner
Engie- Electrabel NV
Customer
Engie- Electrabel NV
Industry
Energy
Construction location
Belgium
Contruction period
13 Months
Contributors
100
Specialties
The plant, which was formerly used as a coal-fired power plant, is becoming the site of the energy transition. The new combined cycle power plant is expected to create supply stability for 700,000 households by the end of 2025.

Our challenges during the approximately 13-month construction period are a large number of heavy-duty lifts, tight delivery schedules due to numerous jobs and trades taking place at the same time in a small space.
Scope of delivery & service
Mechanical assembly of the gas and steam turbine.

About our customer Engie- Electrabel NV

Electrabel is part of ENGIE, a global leader in energy and energy services.

The ENGIE Group is working in 20 countries on the transition to a carbon-free world.

Safe. Global. Fast.

Worldwide projects on time & professionally.

YouTube is deactivated

We need your consent to use YouTube videos. For more information, see our Privacy Policy.

Vimeo is deactivated

We need your consent to use Vimeo videos. For more information, see our Privacy Policy.

Google Maps is deactivated

We need your consent to use Google Maps. For more information, see our Privacy Policy.