Working together for green technology: #SGSteam is part of the Swiss Krono Green Energy project in Sully-sur-Loire
Project data
- Commissioner
- Swiss Krono S.A.S.
- Customer
- Swiss Krono S.A.S.
- Industry
- Wood-based products
- Construction location
- Sully-sur-Loire, France
- Contruction period
- 10 months
- Contributors
- 50
Scope of delivery & service
Mechanical assembly and electrical installation of the complete conveyor technology
- the entire conveyor system
- two wet chip bunkers for OSB strands
- two pneumatic conveyors
- more than 1,000 tonnes of steel construction
- almost 60,000 working hours
Our scope of services
SGS Industrial Services is responsible for the mechanical assembly and electrical installation of this project
- the complete conveyor technology
- two wet chip bunkers for OSB strands
- two pneumatic conveyors with a total length of 101 m and 99 m respectively
Special features of this order
Working hand in hand, both within the #SGSteam and with the customer, is also very important in this project in France. Due to the limited space available, coordination on the construction site is particularly important – many trades are working simultaneously, resulting in a large number of cranes in a small space.
About our customer Swiss Krono S.A.S.
Swiss Krono S.A.S. produces 850,000 m³ of end products annually in Sully-sur-Loire, France. Currently, around 400 employees are responsible for the manufacture and marketing of wood-based products such as chipboard, OSB and melamine decorative panels, HPL laminates and edge banding.
With the current project in Sully-sur-Loire, Swiss Krono S.A.S. is taking another significant step forward in its green energy project.