  Assembly of the new wood fibre insulation board plant from Naturheld

Industry
Wood-based products
Country
Grafenwöhr, Germany DE
Status
completed
At Naturheld, a Ziegler Group company, the first board rolled off the production line at the end of August 2022. Our SGS team took charge of the assembly of the new wood fibre insulation board plant. The project started in February of 2022. With this project, our SGS team was responsible for the mechanical and electrical assembly of the components - from wood chips to the smallest wood fibre to the finished ecological insulation board. The components for defibration (silo discharge, bucket elevators, conveying equipment up to the refiner) were supplied by Andritz. Dieffenbacher supplied systems starting from the transfer of wood fibres to the dryer, the Evojet gluing system and the press. Alongside assembly, SGS also took charge of all the piping and insulation for these areas, with pipe prefabrication carried out directly on the construction site. The SGS team was on site with up to 120 employees, 70 from mechanical and 50 from electrical, to set up the plant at Naturheld.
YouTube is deactivated

We need your consent to use YouTube videos. For more information, see our Privacy Policy.

Vimeo is deactivated

We need your consent to use Vimeo videos. For more information, see our Privacy Policy.

Google Maps is deactivated

We need your consent to use Google Maps. For more information, see our Privacy Policy.